On the pbr profile installers should.
Metal siding installation guide.
Each section of this installation manual is designed to guide you through every step of.
See page 20 for instructions on cutting methods.
Install the roofing screws vertically along each rib in the panel.
Place the first screw.
Distance may vary for sealants and roof panels due to location install.
If a sheet must be bent a gentle 90 degree bend is the maximum recommended.
When a metal roofing sheet must be installed on a curved roof screws should.
Steel siding has sharp edges.
Instead use a protective base of con crete treated wood or similar material and stop the siding sheets 6 above grade.
Install roofing pan els a minimum of 4 from the center of the valley.
For installation open the entire box and lift pieces rather than slide them to prevent scratching.
Always keep siding material dry and protected.
Apply two rows of silicone sealant or butyl mastic parallel to the valley onto the valley flash ing.
Place the first siding sheet in place.
Handle siding with care.
Metal siding should be installed using the stan dard fastening and overlap patterns.
Installing metal siding can be fairly simple if you follow the instructions in this manual.
Do not run the siding sheets all the way to the ground.
Tilt the box 90 degrees on its side during transport.
Aluminum roofing and siding sheets are rollformed from hardened tempered metal for maximum strength.
Installation procedures for aluminum or steel siding are nearly identical with one exception cutting procedures.
Things you ll need furring strips and sheathing if you re working on an uneven surface hammer nails metal siding j channel tin snips or power saw measuring tape level.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Installation guides from asc building products a leading manufacturer of metal roofing and siding for residential commercial and agricultural applications.
Nail the sheet into place using the holes pre fabricated into the metal or nail the sheets to the studs according to manufacturer instructions.
6 and 8 up from the center of the valley.
Make sure product is stored flat with support under the length of box.